BETA Technologies possible $70, end of ~2028.
*The Factors necessary for the stock price to Rocket UP:
*Routes under iEPP for Cargo
*Large Defense contracts announced by late 2027
*FAA Certification by mid-2027 for CTOL
*FAA Certification by mid-2028 for eVTOL
*UAE Routes by mid 2027
*Expansion of Models to include newer Designs
IMO.
12 Views


BETA excels in its Simple Design. The CTOL has One engine, has covered over $100K nm, the eVTOL ~40K nm (not sure about accuracy). It was tested by the Military and it was the only electric flying vehicle that had 100% Up time. The eVTOL has 4 engines dedicated to vertical lift that stay vertical and one horizontal motor for speed.
Joby is a beautiful design but it's too complex. Before each flight they have a group of engineers examine the internals of it and check everything out then to agree that it was ready to fly. I emphasize the word GROUP. It has 5 articulated engines that move; Archer has 6, along with 6 vertical engines.
Due to simplicity for CTOL, and the simple eVTOL design with only 5 engines that are fixed in place - it could win Big Defense Contracts.
If the CTOL & eVTOL prove to have much less operational cost the models should become very popular for organizations wanting to minimize cost, and maximize uptime.